Poles & Equipment
Maintain field asset records for poles, cabinets, splitters, enclosures, switches, UPS units, routes, inspections, permits, and maintenance.
Controlled field-asset registry
Asset coordinates, inspection findings, ownership, permits, and attachments require authorized backend storage and audit history. Field condition and safety findings must be verified by qualified personnel before any work order or corrective action.
0
Registered Poles
Company, utility, LGU, and privately owned pole records
0
Network Equipment
Cabinets, splitters, closures, switches, UPS units, and enclosures
0
Inspection Due
Assets due or overdue for documented field inspection
0
Critical Findings
Unresolved safety, structural, capacity, permit, or equipment issues
Inventory Filters
Search and filter pole and equipment records.
Field Asset Inventory
0 assets registered
Inspection & Maintenance Queue
Upcoming, overdue, and critical field activities.
| Asset | Activity | Priority | Due Date | Assigned Team | Status | Work Order |
|---|---|---|---|---|---|---|
No maintenance activities loadedScheduled inspections and work orders will appear after backend integration. |
||||||
Ownership & Compliance
Permit, RTA, attachment, and verification completeness.
Missing Ownership
Owner or authority not recorded
Missing Permit / RTA
Required document not linked
Expiring Documents
Expiry falls inside alert window
Missing Asset Photos
No current verification image
Capacity & Safety Controls
Data checks required before field planning or network expansion.
Capacity Warning
Splitter, cabinet, port, enclosure, or pole loading near configured limit.
Safety Finding
Structural, clearance, electrical, access, or attachment issue.
Location Mismatch
GIS point conflicts with route, zone, address, or field verification.
Duplicate Asset ID
Conflicting pole number, asset code, serial number, or barcode.